4Linked projects
Cross-project improvement system
See the process.
Improve what matters.
A shared Six Sigma workspace for tracing measures, evidence and experiments across Roggemans projects.
4Active processes
8Linked measures
4Experiments
Process catalog
Choose a value stream
Roggemans.Marketing.Services
Campaign experiment loop
Move a campaign from hypothesis through launch, measurement and optimization.
Value stream
Campaign experiment loop
Move a campaign from hypothesis through launch, measurement and optimization.
Process metrics
Campaign conversion
5.3 %
Baseline 3.1 · Target 5
Cost per qualified lead
31 EUR
Baseline 48 · Target 32
Delay
2 · 66.7%
Σ 66.7%
Quality
1 · 33.3%
Σ 100%
Defect trend
1
1
1
Attention required
FMEA · Standardize hand-off criteria
ghislain.roggemans@divintage.com · InProgress
Overdue · Operationalize shorter lead form
ghislain.roggemans@divintage.com · due 2026-08-23
Out of control · 3.6
Review the latest evidence, notify the process owner, and start corrective action.
Prioritized opportunities
React to out-of-control observation
Measured evidence
Measured value 3.6 breached control 9a26bdb7-4ba9-9a7b-4b98-d10010942957.
Complete overdue action: Operationalize shorter lead form
Measured evidence
Action was due 2026-08-23T18:00:48.6482005+00:00 and remains InProgress.
Reduce Delay defects
Measured evidence
2 measured defects contribute 66.7% of the selected population.
Mitigate FMEA failure mode: Incomplete hand-off
UserProvided evidence
FMEA rating evidence from Campaign experiment loop hand-off FMEA; method RiskPriorityNumber.
Reduce Quality defects
Measured evidence
1 measured defects contribute 33.3% of the selected population.
Analysis scope: Entire value stream
Measured evidence
Measures and observations
Roggemans.Marketing.Services
5.3 %Campaign conversion
Baseline 3.1Target 5Higher is better
04 Aug11 Aug18 Aug
Roggemans.Marketing.Services
31 EURCost per qualified lead
Baseline 48Target 32Lower is better
04 Aug11 Aug18 Aug